NASA has unveiled its most detailed plan yet for a permanent base on the Moon, announcing a package of contracts and mission updates on Saturday, November 7, 2026, at the MAX POWER aerospace expo at the Kennedy Space Center in Florida. The centrepiece is a new $10 billion framework for commercial cargo deliveries to the lunar surface, alongside a nuclear-powered rover that will scout the Moon’s South Pole for ice.
The announcement marks a major step in NASA’s Moon Base programme, which aims to establish a sustained human presence near the lunar South Pole with the help of American industry. “We are building the Moon Base mission by mission,” said NASA Administrator Jared Isaacman. “When our astronauts return to the Moon, they will arrive with the first elements of the Moon Base already waiting for them on the surface.”
A $10 Billion Delivery Network for the Moon
At the heart of the plan is the next phase of NASA’s Commercial Lunar Payload Services programme, known as CLPS 2. NASA selected eight companies to compete for future cargo runs to the lunar surface under a 10-year contract with a combined maximum value of $10 billion: Blue Origin, Firefly Aerospace, Intuitive Machines, ispace-U.S., Lockheed Martin Space, Northrop Grumman Space Systems, SpaceX and Voyager Technologies.
The companies will manage, build and operate landers that carry NASA science, technology and infrastructure payloads to the Moon. The $10 billion figure is a ceiling for future task orders, not money already spent, and no specific delivery missions have been awarded under the new framework yet.
NASA also raised the value of the existing CLPS 1.0 contract from $2.6 billion to $4.2 billion to fund the first phase of Moon Base work. The original contract remains in place through November 2028, with a further five years to complete awarded deliveries through November 2033.
PROMISE: A Nuclear Rover Built From Mars Rover Parts
The most striking project in the announcement is PROMISE, short for Polar Rover for Observation, Mapping, and In-Situ Exploration. The six-wheeled, nuclear-powered rover will land at the Moon’s South Pole to map the surface and subsurface, assess resources and gather data for choosing landing sites and planning future infrastructure.
Because it runs on nuclear power, PROMISE can keep working through the long lunar nights and inside permanently shadowed craters thought to harbour water ice, places where solar-powered rovers would go dark. Ice at the South Pole matters because it could one day be turned into drinking water, breathable oxygen and even rocket fuel for a sustained human presence.
NASA’s Jet Propulsion Laboratory in Southern California will manage the mission and build the rover from spare flight components and engineering test models left over from the Curiosity and Perseverance Mars rovers. Using proven hardware is meant to cut costs and speed up testing, and NASA says it has checked that the hardware can survive the harsh conditions near the lunar South Pole.
PROMISE will carry a drill to pull up lunar soil from about one metre below the surface, spectrometers to analyse its chemical make-up, temperature and radiation sensors, and visible-light cameras. It will also test a next-generation, radiation-tolerant computer system and advanced self-driving sensors and software. NASA is targeting a late 2028 launch and an 18-month mission.
Blue Origin won a $94 million base contract, with a further $140 million available if performance targets are met, to deliver PROMISE to the South Pole aboard its Mark 1 lander.
Rockets, Orbital Freight Trucks and Moon Drones
Getting base hardware to the Moon will need a transport network between Earth and the Moon. NASA awarded six task orders worth about $1.3 billion combined under its Venture-Class Acquisition of Dedicated and Rideshare launch contract, going to Arrow Science and Technology, Blue Origin and Impulse Space to integrate and transport Moon Base cargo.
Some of the missions will fly aboard Blue Origin’s New Glenn, Relativity Space’s Terran R and SpaceX’s Falcon 9 rockets. In-space transport will be provided by Blue Origin, Firefly Aerospace, Impulse Space and Quantum Space.
The missions fall into three types. The first will test communications, navigation and orbital transfer vehicles, the long-distance freight trucks of cislunar space, including a flight of the CAPSTONE 02 spacecraft to test manoeuvres around the Moon. The second will send highly mobile drones to survey the South Pole before astronauts arrive, including NASA’s MoonFall drones, which are designed to scout areas beyond the reach of traditional rovers. The third will test navigation technologies and operations across multiple orbits between Earth and the Moon.
Separately, NASA selected SpaceX to launch communications satellites aboard a Starship to cislunar space in 2028, a demonstration that will inform future lunar communications networks keeping astronauts, mission control and the Moon Base connected.
Power and Communications for the Lunar Surface
To extend infrastructure on the surface, NASA plans to buy commercial parts for a Mini-Communications and Solar Tower, known as miniCAST, which will combine power and communications for future Moon Base work. Honeybee Robotics, a Blue Origin company, was awarded the energy storage work, Redwire will provide power generation, and Yank Technologies will supply wireless power-transfer hardware. Engineers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, will assemble and test the systems before they are sent to the Moon.
NASA expects work to begin within months and plans a separate solicitation for fully integrated power systems in early 2027. The agency also intends to issue a call under its NextSTEP-3 B programme to close high-priority data gaps for Moon Base planning.
What Comes Next
Taken together, the awards cover nearly every part of the Moon Base campaign: cargo landers, a scouting rover, launch and orbital transport, communications and surface power. NASA says work on the first components will begin within months, with the initial effort focused on individual components rather than one large integrated system.
The schedule is ambitious and the dates are targets, not guarantees; lunar programmes have slipped before. But if the plan holds, the first pieces of a permanent lunar outpost will be waiting on the surface when Artemis astronauts return, laying the groundwork not only for an enduring presence on the Moon but, as NASA puts it, for the first crewed mission to Mars.
Sources: NASA (news release RELEASE26-095, November 7, 2026); NASASpaceFlight; Scientific American; T-SPAN.